We were asked by the main contractor, Agincourt Contractors Ltd to supply the cast stone plinth, band course, all the window cills, window jambs and window heads. The french door surrounds and the main entrance and portico. Working from architects drawings we produced cad workshop drawings which were sent to the architects and main contractor for approval prior to mould manufacture. The pieces were then cast to match Bath stone.
Working with the architects and engineer on the portico design and construction we produced workshop drawings for approval prior to making moulds. We then manufactured the cast stone. We also supplied all the structural steel work for the portico and advised on fixing. In addition to the four columns we also manufacture four pilasters and the door surround.